About train 93001 — Virar - Dahanu Road Slow Local
- Route
- Virar (VR) → Dahanu Road (DRD)
- Distance
- 64 km
- Duration
- 1h 25m
- Halts
- 7
- Punctuality
- Virar - Dahanu Road Slow Local arrived on time on 7% of its last 44 runs (averaging 176 min late). Delays build up most around Dahanu Road.
- Latest run
- On its latest recorded run (Sun, 26 Jul, 2026), it was running 127 min late at Vangaon.
- Coaches
- Runs with FC coaches.
Schedule at a glance
- Virar VR04:50 / 04:500 km
- Vaitarna VTN04:59 / 05:018 km
- Saphale SAH05:08 / 05:0916 km
- Kelve Road KLV05:15 / 05:1622 km
- Palghar PLG05:31 / 05:3231 km
- Umroli UOI05:37 / 05:3837 km
- Boisar BOR05:43 / 05:4442 km
- Vangaon VGN05:50 / 05:5251 km
- Dahanu Road DRD06:15 / 06:1564 km